Calculating the right quantity of cement, sand, and aggregates is pivotal when undertaking the construction of a slab. This process ensures efficient resource utilization and, consequently, the structural integrity of the slab. Let’s explore the step-by-step approach to determine these quantities for a flat slab covering an area of 1000 square feet.
The first step involves establishing the wet volume of the slab. Given that the minimum thickness for the slab is 150mm (0.15 meters), the wet volume is computed as the product of the slab area and its thickness. For our example, the wet volume is 93 square meters multiplied by 0.15 meters, resulting in 13.95 cubic meters.
To calculate the quantities of materials needed, we transition from wet volume to dry volume. The conversion factor used is 1.54, which represents a 54% increase in volume from wet to dry. Therefore, the dry volume is computed as 13.95 cubic meters multiplied by 1.54, yielding approximately 21.48 cubic meters.
Considering M20 grade concrete (1:1.5:3 ratio for Cement:Sand:Aggregates), we can now determine the quantity of each material.
In summary, the quantities needed for slab construction are as follows:
This detailed calculation ensures that the right materials are procured, contributing to the successful construction of a sturdy and reliable slab.